Block 42 at Bergen-Belsen KZ/Gedenkstätte

  First Previous Image 7 of 17

Next Last  
View Photograph Location
Building
  First Previous

Next Last  

The preparations for Mass Grave 1. The bulldozer, operated by 14322433 Sapper Frank Chapman, 619 Field Park Company, Royal Engineers, was also used to push badly decomposed bodies into mass graves. Block 42 can be seen in the background.
Dated: 17 April 1945
Source: Imperial War Museum/Sergeant Harry Oakes

If you wish to refer to this image in any correspondence please use Reference Number: 527